CCM Construction Services, LLC’s education construction experience is extensive and includes K-12, higher education, community college, and government training facilities.  Within education, CCM assignments have involved renovation, disaster recovery (FEMA), and new construction.  Our team is experienced in green and sustainable technologies as well as special construction requirements.

Project Results

Education Construction by CCM

A south Texas university system was severely impacted by a major hurricane in 2008. Extensive repairs and renovations were required both immediately and ongoing. CCM provided on-request cost estimating services for FEMA recovery, mitigation, and design-phase efforts. The scope of work involved over 80 buildings including student housing complexes, historical structures, administrative facilities, hospitals, and service buildings. Results – CCM, for more than one year, provided hundreds of FEMA and design-phase cost estimate submittals, routinely meeting owner and design team workload requirements and tight schedule.

Education Projects by CCMA central Texas-based university system designed and constructed a new $13 million student union facility.  CCM consultants provided design-phase cost estimating services including conceptual, schematic design, design development, and construction document phase submittals.  Results – 3.2% variance from average of 18 bidders.

During the expansion and renovation of a south Texas-based college classroom and administration facility, CCM was retained for design-phase cost estimating services.  Total project cost was over $7 million and included substantial MEP and central plant upgrades.  Construction document phase cost estimates were submitted to the owner and design team. Results – 3.3% delta from average of seven qualified bidders.

education3

A major east Texas university branch designed and constructed a music building.  The over $22 million facility included specialized classrooms for music education, a premier concert hall, faculty offices, and administrative spaces.  CCM consultants provided cost estimates at schematic design, design development, and construction documents phases.  Results – 0.4% variance from final negotiated construction manager guaranteed maximum price (GMP).